In some cases, there might exist users that need to insert two half-day leaves on the same day. For those cases the system now allows users to insert two half-days on the same day with different leave types when inserted the two half-days on the timesheets will count as a full day.
Figure 1 - Leaves module with two half-day leaves scheduled
Configurations
- Set the role "VacationSave" on the User form.
Proposed Tests
- Enter with a user.
- Go to the Leaves module.
- Select One type of leave.
- Schedule one half-day.
- Select another type of leave.
- Schedule a half-day on the same day inserted on 4.
- Through the tooltip, verify that both types have been added.