Figure 1 - User cost currency code in the Project Report
When exporting the Project Report, the user cost currency code was not showing. The user would see a value in the user cost column but wouldn't know which currency was being taken into consideration for that analysis.
Prevent Future Issues
Non-applicable
Configurations
Non-applicable
Proposed Tests
- Associate a user cost to a few users by accessing the user form, clicking on the "Monthly Costs" sub-tab at the end of the page and adding a monthly/hourly cost for a specific time frame;
- Log into the system with those users and key in timesheet hours under projects in which the start/end dates are within those specified above;
- Access the reports module;
- Select to open the Project report;
- Apply the filters by choosing the time frame as necessary;
- Export the report to an Excel document;
- Verify that the currency column is now showing a code (e.g.: EUR, USD, BRL)
Historical Data
Non-applicable
Comments
0 comments
Please sign in to leave a comment.