Figure 1 - User Form
Cause
When a user gets his responsible change regarding the leaves approval (Leaves and HR Leaves), the previous history of scheduled leaves should be acquired by the new responsible
Prevent Future Issues
Non-applicable
Configurations
Go to a user form with leaves already scheduled and:
- On the responsibles' tab change the leave approver defined
Proposed Tests
- Enter with the user that had the responsible changed
- Go to the Leaves approval tab
- Verify that the previously scheduled leaves (approved and to approve) appear
Historical Data
Non applicable
Comments
0 comments
Please sign in to leave a comment.