Figura 1 - Tab de Horas Planeadas na vista de detalhe do Projecto
Causa
Projects managers have the possibility to change Planned Hours in the Project. They should only have access to changing Adjusted Hours (it will be called Forecast - there is a registered ticket dor this request)
Prevent Futures Problems
Not-applicable
Configurations
Go to the User Form and:
- Add the role "ContractedTimeSave"
Proposed Tests
- Go to a Project.
- Select the Planned Hours tab
- Verify that the system allows to do modifications and saves those changes successefully
Historical Data
- Read - Users with the role "ProjectRead", the role "ContractedTimeRead" has been added
- Save -Users with the role "ProjectSave", the role "ContractedTimeSave" has been added
- Write -Users with the role "ProjectWrite", the role "ContractedTimeWrite" has been added